Construction and installation of a new pilot/cow catcher on the front of the engine.
Construction and installation of a new smokestack.
Construction and installation of the Russia-iron boiler jacket, to be set off by brass bands that have been treated to lend them the patina of weathered metal.
The gloss-black smoke box also was “weathered” with flat black paint.
The locomotive’s wooden cab was stripped and repainted.
Rusted out sections of the tender were replaced with new steel.