Customers
Permitting: Utility, Wireless Infrastructure Installations and Rights of Entry
Accessing CSX property for any purpose requires permission. Any construction requires plan review, flagging and/or inspection, scheduling, and a signed Agreement from CSX. Safety is our overarching concern.
Utility Permits: Utilities that go over, across, or under the railroad tracks or CSX property. See separate section below for longitudinal occupancies (i.e. utilities paralleling tracks).
Rights of Entry Permits: Right of Entry access for temporary purposes ONLY.
Wireless Infrastructure Permits: The construction of new or co-location of wireless equipment on CSX property.
Longitudinal Occupancy Permits: The construction of new utilities that run alongside (i.e. parallel) the railroad tracks and/or CSX property.
CSX is aware of an issue with the Property Portal affecting users and the issue should be resolved soon. Apologies for the inconvenience and thank you for your patience while this is resolved!!
Related Links
Troubleshooting Tips
Contacts by Territory